Project Partner: City of El Paso
ESD LANDFILL
Scope of Work: 96 acres of final cover construction for the landfill. Final cover construction includes 6 inches of base layer and 18 inches of infiltration layer with in-situ soil material, and 4-inch rock armoring on top of the infiltration layer to prevent erosion. Project also includes on-site drainage improvements.
Project Partner: City of El Paso
ESD LANDFILL
Scope of Work: 96 acres of final cover construction for the landfill. Final cover construction includes 6 inches of base layer and 18 inches of infiltration layer with in-situ soil material, and 4-inch rock armoring on top of the infiltration layer to prevent erosion. Project also includes on-site drainage improvements.
Location
El Paso, TX
Project Partner
City of El Paso
Year
2021
Status
Completed